jpb-designs.com

slide 1
Image Slide 2
Branciforte Library
Image Slide 1
Image Slide 1
previous arrowprevious arrow
next arrownext arrow
Shadow

Branciforte Branch Library Renovation

Interior renovation of the existing library facility, including installation of new exterior windows and doors as specified. The project involved no change in use, square footage, or egress, and included accessibility compliance upgrades to meet current standards.

Las Palmas Elementary – Kindergarten Play Area & Shade Structure

Site preparation and installation of a new metal shade structure, including pier footings and coordination with the shade structure manufacturer. Scope also included the addition of a new play structure, site paving, fencing and gates, striping, a drinking fountain, and related site improvements.

slide 1
Image Slide 1
KINDERGARTEN PLAY AREA
Image Slide 2
Image Slide 1
Image Slide 3
previous arrowprevious arrow
next arrownext arrow
Shadow
slide 1
Image Slide 1
KINDERGARTEN PLAY AREA
Image Slide 2
Image Slide 1
Image Slide 3
previous arrowprevious arrow
next arrownext arrow
Shadow

Kindergarten Play Area & Shade Structure

Site preparation and installation of a new metal shade structure, including pier footings and coordination with the shade structure manufacturer. Scope also included the addition of a new play structure, site paving, fencing and gates, striping, a drinking fountain, and related site improvements.

slide 1
Image Slide 2
Dry Creek Elementary School Portables
Image Slide 1
Image Slide 1
Image Slide 3
Image Slide 3
Image Slide 3
Image Slide 3
previous arrowprevious arrow
next arrownext arrow
Shadow

Dry Creek Elementary School Portables Phase2

Relocation, refurbishment, and installation of two existing 24′ x 40′ relocatable classroom buildings from Fairbanks Elementary School to Dry Creek Elementary School. Scope included new wood crib foundations, associated site work, and installation of four pre-engineered ramps and landings.